This project focused on the complete installation of a high-efficiency ventilation system for a 50,000 sq. ft. modern logistics center. The primary objective was to ensure consistent air circulation and temperature control while minimizing energy loss through air leakage.
Under the Airduct brand, ZENGO GROUP LIMITED supplied a full suite of components, including precision-engineered spiral ducts, heavy-duty volume control dampers, and airtight access doors. The project involved coordinating the supply chain to meet a tight construction schedule, ensuring that every fitting and duct segment integrated seamlessly to create a low-friction, high-performance airflow network.
